1. Bidding conditions

The title of this bid is: Qinghai Company Qinghai Gelmu Tumeiren 100 MW and the online photovoltaic power generation photovoltaic assembly procurement public bidding. The project bid number is: CEZB200204769. The bidder is the Qinghai Branch of China Electric Group Co., Ltd., the source of funds is self-declared, and the bidding representative agency is China Shenhua International Engineering Co., Ltd. This project has bidding conditions and public bidding is now being made for this project.

This project adopts the full electronic bidding method.

2. Project Overview and Tendering Scope

2.1 Project Overview: This project is the middle-market project of the 2# Haixi Prefecture Building 2 in Qinghai Province in 2020. The machine capacity is 100MWp. It is located in Geer, Haixi Prefecture, Qinghai ProvinceSugar babyMutu Meiren Photovoltaic Hot Park, Mushi In the south of baby, the straight distance to the west of Germu City is about 140km. The site area is unused land in Wasteland and Huahua, and the important thing is Wasteland and sandy land. There is Provincial Highway S303 about 14km north of the site. Sugar daddy can be accessed by Provincial Highway S303 through the park planning highway, which is more convenient and easy to deal with international communication conditions. ”The altitude is about 2970m. The total air volume of the plan is 1.7Sugar daddy45km2.

The DC side installation capacity of the photovoltaic station is 100.53472MWp and the traffic side capacity is 86.45MW. A single crystal silicon single-surface assembly is used, the assembly power is ≥440W, and the fixed bracket method is installed. Each 3.87MWp assembly and 3.15MVA box are transformed into one sub-cage, with a total of 26 sub-cages; every 26 units are connected to one photovoltaic group, and every 18 channels are connected to one unit series inverter, and every 19 inverters are connected to one platform 3.15MVA pressure lift box, which increases the low-pressure traffic power output from the inverter to 35kV.

2.2 Tender Scope: This bidding purchases 100.53472MWp photovoltaic components, and the components type is: single crystal single surface (all with frames) 440Wp or 445Wp. Sugar babyPhotovoltaic components include the product body and its accessories (including cable box connection cables, MC4 plug-in heads and special items, etc.), supporting services, etc.

2.3 Daily delivery date:

Planned delivery time (in batches Escort):

On October 1, 2020, the first batch arrives Escort carries no less than 30MW pieces;

On October 20, 2020, the second batch of shipments was no less than 30MW pieces;

On November 20, 2020, the last batch was based on the actual delivery volume. .

2.4 Delivery Location: Utumiren 2020-2#, Germu City, Haixi Prefecture, Qinghai Province, the straight distance to the west of Germu City is about 140km, and the delivery location is about 14km north of the delivery location, and Provincial Highway S303 is passed. The designated location of the construction site (car board delivery). The seller adjusts the transportation to meet the contract delivery period or to allow other non-buyers to obtain transportation Sugar baby plan, the buyer shall not bear any fees incurred as a result.

2.5 Quality warranty period: ten years after passing and online acceptance.

3.3. Qualification request for bidder

3.1 For this bidder, the bidder must have the following Sugar daddyRequest:

(1) The bidder shall be an independent property manufacturing enterprise registered in accordance with the law, and shall have ordinary taxpayers who have the ability to be civil and responsible within their legal business scope;

(2) The bidder shall have a useful quality governance bodySugar baby system certificates are to be provided for useful certification documents; battery components products provided by the bidder must be certified by the domestic or international certification authority and to be provided for useful certification documents (CQC or CGC or Sugar babyTVU Certification Book).

Professional Request: The bidder needs to supply the cumulative sales of photovoltaic components with a capacity of 2GW or more from January 1, 2017 to the bid deadline (based on the contractual order time)Industry statistics, among which: no less than 2 single-standard single crystal photovoltaic components of 50MW or more are for supplying business statistics. (The bidder shall provide the contract and user escort that can prove the bidding requirements. The drawings shall include at most: contract purchase and sale double-party seal page, contract period, property name number and key technical parameters and other information; the user escort must be provided by the final user, Pinay escortThe contract party A or third-party authority seal may verify receipt certificates, application certificates, visit records or other information that can prove the contract’s mark; the supply industry can be accumulated)

Note: The parent and subsidiary company’s financial performance shall not be borrowed from each other.

3.2 This project Sugar daddy does not accept joint bids.

4. Acquisition of bidding documents

4.1 Anyone who is interested in participating in the bidding must complete the registration of the National Dynamics Group supplier at the “National Dynamics Tendering Network” (http://www.chnenergybidding.com.cn) before bidding. Appendix 1 of the registered bidders.

4.2 Purchase route: For bidders who have completed registration, please log in to the “National Dynamic Bidding Network’s bidder business system”, upload the purchase tag review data in the “Purchase Application” menu according to the request, and after the review is approved, complete the purchase of bidding documents online.

4.3 When purchasing bidding documents Sugar daddy: August 20, 2020 09:00 to August 26, 2020 16:30. Potential bidders who fail to obtain bidding documents in accordance with this notice shall not participate in bidding.

4.4 The bidding documents are sold for each set of RMB 1,000.0 per section/insurance, and will not be refunded after sales.

5. Viewing bid documents and editing bid documents

This project uses the full electronic method to bid. The bidder must download the “National Power Tendering Network Tendering Business System “System Download” from the National Power Tendering Network’s bidder business system “System Download” and related operation manuals for operation. The specific operation process is as follows:

5.1 The bidder logs into the National Power Tendering Network’s bidder business system by himself: http://www.chnenergybidding.com.cn/bidhy.

5.2 Click the “Help Middle” button in the upper right corner to download “Engineering Company Tendering and Tendering System User Manual – Electronic Tag (Tendering and Tendering Manual)”.

5.3 Click the “Article Download” button in the upper right, and then download the “National Dynamic Tendering Network Drive Installation Package” and “National Dynamic Tendering Network Tag Document Production Things” in the pop-up page and install it.

Sugar daddyNote: The bidding documents for this project are a special pattern, and the bidder must complete the above operations before they can browse the bidding documents.

5.4 The bidder must handle the CA digital certificate before completing the editing of the bid documents and the bidding of this project. For details on the CA digital certificate processing process, please visit Appendix II of this notice.

Note: The bidder needs to handle the CA digital certificate as soon as possible. If the CA digital certificate or CA digital certificate has expired, it will cause the girl who will return to the service station to sit back to the service station. Sugar daddy starts to scan short videos, and I don’t know what matters cannot be handled.

5.5 The bidder shall compile the bid documents in the “National Dynamic Bidding Network bid document production” in accordance with the bid documents requested. For specific operation details, please refer to “Engineering Company Bidding and Tendering System User Manual – Electronic Tag (Tendering Manual)”. The following chapters are key chapters. Please read the bidders in detail.

1.1–1. That day she was so painful that she couldn’t get out of bed. The man who was on a business trip suddenly appeared. Chapter 7 (System preparation later)

1.9 (CA lock is determined)

2.5 (File collection)

2.9 “Sister, wipe your clothes first.”

2.9 (Tagged the big hall Sugar baby)

3.1 Chapter 3.1 Escort (Installing the bidding file to make something)

3.2 Chapter 3.2 (Making electronic bidding file to make)